Completed Infrastructure

Raipur–Naya Raipur Expressway (Atal Path)

A 12.7 km, 6-lane, access-controlled expressway with 4 flyovers connecting Fafadih (Raipur) to Shadani Darbar (Naya Raipur) — already operational.

April 3, 2026 Greater Raipur 1 min read Fafadih (Raipur) – Shadani Darbar (Naya Raipur)

Project Snapshot

Government Agency PWD, Government of Chhattisgarh
Budget
Timeline Timeline pending
Reference Reference pending
Execution progress 100%

Already operational, the Atal Path Expressway provides fast, access-controlled connectivity between Raipur city center and Naya Raipur. It crosses over GE Road (NH-53) via multiple flyovers and an elevated corridor.

StatusOperational
Length12.7 km (6-lane, access-controlled)
RouteFafadih (Raipur) → Shadani Darbar (Naya Raipur)
Features4 flyovers + 1 elevated corridor
Maintained byPWD, Government of Chhattisgarh

Key Features

  • 4 flyovers and 1 elevated corridor crossing NH-53
  • Significantly eased traffic on the formerly congested Raipur–Naya Raipur route
  • Served as the backbone for the Nava Vihar TOD Scheme
  • Dedicated service roads on both sides

Share this brief
Back to tracker
Report Issue